paint-brush
Implementing Blue-Green Deployments with AWS Elastic Beanstalkby@raghava
465 reads
465 reads

Implementing Blue-Green Deployments with AWS Elastic Beanstalk

by Raghava Dittakavi3mAugust 9th, 2023
Read on Terminal Reader
Read this story w/o Javascript
tldt arrow

Too Long; Didn't Read

The importance of continuous deployment and constant service delivery can't be overstated, says the team at Hackernoon. The team is working on a new version of the codebase that will be released in the next few weeks. The code will be written in a language that can be easily translated into English.
featured image - Implementing Blue-Green Deployments with AWS Elastic Beanstalk
Raghava Dittakavi HackerNoon profile picture
0-item
1-item


In the dynamic realm of software development, the importance of continuous deployment and delivery can’t be overstated. They serve as key success determinants. Deployment strategies such as Blue-Green Deployments are commonly adopted by developers and DevOps teams to facilitate smooth updates and maintain high availability. This piece will delve into the Blue-Green deployment concept and illustrate how to use AWS Elastic Beanstalk, a fully managed service, for effective implementation. This service simplifies the deployment and scaling of applications.


Comprehending Blue-Green Deployments

Blue-Green deployments represent a tactic aimed at facilitating updates and rollbacks without downtime. It achieves this by maintaining two identical settings: one for production (green) and the other for implementing the new change (blue).


The Green environment caters to live traffic, while the Blue one remains idle during the update phase. Upon successful deployment and testing of new changes in the Blue environment, a switch occurs, rerouting traffic to the updated Blue environment, which assumes the role of the new production environment.


The former Green environment transitions to an inactive state, awaiting upcoming updates or rollbacks if required. This mention notably minimizes the risk of downtime or potential complications within the deployment process.


Step 1: Application Preparation

Before establishing Blue-Green deployments, confirm your application’s compatibility with Elastic Beanstalk. Package your application code into a deployable format, like a ZIP file or container image. Also, generate a configuration file, such as a Docker run file for containerized applications, outlining your application’s deployment process and operation by Elastic Beanstalk.

Step 2: Establish two Environments

Within Elastic Beanstalk, construct two environments. Designate one for production (green) and the second for testing (blue). Achieve this via the AWS Management Console or the AWS Command Line Interface (CLI)

Step 3: Application Deployment to the Blue Environment

Proceed with uploading your application code or container image to the Blue environment for deployment. Elastic Beanstalk takes charge of the deployment process and establishes the required resources.

Step 4: Examination and Verification

Once the Blue environment is operational, conduct exhaustive testing and validation of your application. This confirms its functionality in the new setting. This stage is vital as it verifies the new change’s stability and readiness for production.

Step 5: Exchange URLs

You can proceed with the real Blue-Green deployment when the testing results meet your expectations. AWS Elastic Beanstalk facilitates URL exchange between the Green and Blue environments. Consequently, the production environment(green) begins to handle traffic from the blue environment, while the Blue environment receives the most recent updates.

Step 6: Monitoring and Rollback (if required)

Keep a close watch on the updated environment to identify performance problems, issues, or errors. If you encounter any severe issues, initiate a rollback of the deployment by exchanging URLs again, which will revert to the earlier stable version.


Conclusion

Blue-Green deployments are effective for accomplishing updates without downtime and guaranteeing a smooth deployment process. Pairing this with AWS Elastic Beanstalk enhances efficiency and control. Adhering to the steps in this article enables the successful execution of Blue-Green deployments for applications, improving the user experience and reducing downtime or disturbances.