paint-brush
Why You Should Use Lead Time Instead of Cycle Timeby@george-guimaraes
140 reads

Why You Should Use Lead Time Instead of Cycle Time

by George Guimarães2mJanuary 18th, 2020
Read on Terminal Reader
Read this story w/o Javascript
tldt arrow

Too Long; Didn't Read

Our concepts of Lead Time and Cycle Time came from the field of Operations Management and Production Engineering. As such, I think it’s beneficial to all of us to maintain coherent with them and use the same semantics in Software Engineering Management as well. Using Throughput or other measurements of deliveries over time, I very much prefer using Throughput to give everyone a better understanding of lead time. I think you should not use cycle time when referring to single items and how many days that item is in the process flow.

Coin Mentioned

Mention Thumbnail
featured image - Why You Should Use Lead Time Instead of Cycle Time
George Guimarães HackerNoon profile picture
George Guimarães

George Guimarães

@george-guimaraes

CEO at SourceLevel

Learn More
LEARN MORE ABOUT @GEORGE-GUIMARAES'S
EXPERTISE AND PLACE ON THE INTERNET.
L O A D I N G
. . . comments & more!

About Author

George Guimarães HackerNoon profile picture
George Guimarães@george-guimaraes
CEO at SourceLevel

TOPICS

THIS ARTICLE WAS FEATURED IN...

Permanent on Arweave
Read on Terminal Reader
Read this story in a terminal
 Terminal
Read this story w/o Javascript
Read this story w/o Javascript
 Lite
Pipfeed